NEWS

最新情報

2025.11.19 / PRESS RELEASE

Hybrid Wood-Steel Construction The mixed-use facility “SALON 91°” is scheduled to open in phases starting late September within the Ginza Takagi Building.

The Birth of a “Non-Staying Hotel” Featuring a Sauna Facility Overlooking Ginza and Dining Establishments for Every Occasion

Takagi Building Co., Ltd. (Headquarters: Nishi-Shimbashi, Minato-ku, Tokyo; President: Hidekuni Takagi), which develops office buildings, residences, coworking offices, and more throughout Tokyo aiming to create new value in real estate, completed the “Ginza Takagi Building” (Location: 7-3-6 Ginza, Chuo-ku, Tokyo) on Monday, May 1, 2023. Starting in late September 2023, the building will sequentially open “SALON 91°,” a mixed-use facility featuring restaurants for enjoying all aspects of daily life, along with the sauna facility “91° SAUNA,” offering panoramic views of Ginza’s streetscape.
>> Press Release Here

The Ginza Takagi Building is a mixed-use commercial building comprising offices and commercial facilities. It is located on the site of the former Ariga Photo Studio Building in Ginza 7-chome, with one basement floor and twelve above-ground floors, totaling a gross floor area of 1,341.83 m². Starting in late September 2023, “SALON 91°” will open in phases. This includes Tokyo’s first store by Takahiro Yamagishi, who perfected Japanese aesthetics in Kyoto; “91° DELI&CAFE by plein,” which also offers catering; and the sauna facility “91° SAUNA,” offering panoramic views of Ginza’s streetscape.

Be yourself in Ginza.
You don’t stay overnight. But you get hotel quality.
SALON 91° is a “non-stay hotel” born in Ginza, themed around “Be your true self,” offering spaces and experiences where people can be themselves.

■ Facility Overview
Location:3-6 Ginza 7-chome, Chuo-ku, Tokyo
Access:4-minute walk from Tokyo Metro Ginza Station Exit C3 / 5-minute walk from Tokyo Metro Shimbashi Station Exit 5
Facilities:Office/Retail Space (Tenant), Sauna, Dining Establishment
      Basement 1 to 2nd Floor
      Floors 3–8: Offices and retail spaces (tenant units)
      Floors 9–10
      Floors 11–12 & Rooftop Floor: Sauna
Site Area:154.01㎡ (46.59 tsubo)
Building Area:119.57 m² (36.17 tsubo)
Total floor area:1,341.83 m² (405.90 tsubo)
Number of Floors:1 basement floor, 12 above-ground floors, R floor
Structure:Basement: Reinforced concrete (partially reinforced steel-concrete composite) / Above ground: Steel frame (partially wood frame)
Construction Company:Tsuboi Kogyo Co., Ltd.
Design Firm: Tetsuo Yamaji Architects
Official Instagram:@salon91_official